Õª Òª
Ëæ×ÅÎÒ¹úµçÁ¦ÏµÍ³ÍøÂç´ó¹æÄ£¸ÄÔ죬µçÍøµÄ¹æÄ£·ÉËÙ·¢Õ¹£¬¶ÔÕû¸ö¹©µç¹ý³Ì½øÐÐÓÐЧµÄʵʱ¼à¿Ø£¬ÊDZ£Ö¤¹©µç¿É¿¿ÐÔºÍÁ¬ÐøÐÔµÄÖØÒªÊֶΡ£
±¾ÎÄÕë¶Ôij110KV½µÑ¹±äµçÕ¾¸ººÉÇé¿öÒÔ¼°½ø¡¢³öÏßÊýÄ¿½øÐÐÏêϸ·ÖÎö£¬¸ù¾Ý¹©µç¿É¿¿£¬ÔËÐÐÁé»î£¬¾¼ÃÐԺõÄÒªÇó£¬È·¶¨ÆäµçÆøÖ÷½ÓÏß·½°¸¡£ÔÚ´Ë»ù´¡ÉÏ£¬ÀûÓÃĿǰ¹úÄÚÁ÷ÐеÄÁ¦¿Ø×é̬Èí¼þ£¬Ö÷ÒªÉè¼ÆÁËÒ»¸ö110KV±äµçվʵʱ¼à¿ØÆ½Ì¨£¬ÊµÏÖ¡°ËÄÒ£¡±(Ò£²â¡¢Ò£ÐÅ¡¢Ò£µ÷¡¢Ò£¿Ø)£¬ÊµÏÖÇúÏß×Ô¶¯Éú³É£¬ÒÔ¼°ÊµÊ±Êý¾ÝÏÔʾ¡¢ÀúÊ·Êý¾Ý²éѯ¡¢±¨¾¯¼Ç¼¹¦Äܵȡ£
¹Ø¼ü´Ê£º
5.0£»±äµçÕ¾£»ÊµÊ±¼à¿Ø
µçÁ¦ÏµÍ³£»Á¦¿Ø
Design of power system real-time monitoring
Abstract
With large-scale transformation of China's electric power system network, power grids, the size of the rapid development of the whole supply process for effective real-time monitoring is to ensure supply reliability and continuity of an important means.
In this paper, a 110KV substation step-down load as well as into, a detailed analysis of the number of outlet, according to supply reliable, flexible operation and a good economy requirements, determine the main electrical wiring program. On this basis, using the strength of the domestic epidemic control configuration software, the main design of a 110KV substation real-time monitoring platform, achieving \, remote, remote adjustment, remote control), and curve automatically generated, and real-time data, historical data query, alarm recording functions.
Key words: Power system; power control5.0; substation; real-time monitoring
Ŀ ¼
Õª Òª .........................................................................................................................................I Abstract ....................................................................................................................................... 1 µÚÒ»Õ Ð÷ ÂÛ ............................................................................................................................ 5
1.1 µçÁ¦ÏµÍ³ÊµÊ±¼à¿ØµÄ±³¾°ºÍÒâÒå.............................................................................. 5
1.1.1 µçÁ¦ÏµÍ³ÊµÊ±¼à¿ØµÄ±³¾°............................................................................... 5 1.1.2 µçÁ¦ÏµÍ³ÊµÊ±¼à¿ØµÄÒâÒå............................................................................... 6 1.2 µçÁ¦ÏµÍ³ÊµÊ±¼à¿ØµÄ·¢Õ¹Ç÷ÊÆ¼°Ç°¾°.................................... ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£ 1.3 ±¾¿ÎÌâÑо¿µÄÖ÷ÒªÎÊÌâ.............................................................................................. 7 1.4 Ñо¿µÄÄ¿µÄºÍÒâÒå...................................................................................................... 8 1.5 ±¾ÕÂС½á ..................................................................................................................... 8 µÚ¶þÕ 110KV±äµçÕ¾µçÆøÖ÷½ÓÏßµÄÉè¼Æ¼°Ö÷ÒªµçÆøÉ豸µÄÑ¡Ôñ .................................... 10
2.1 110KV±äµçÕ¾µçÆøÖ÷½ÓÏßÉè¼Æ ................................................................................ 10
2.1.1 µçÆøÖ÷½ÓÏßÉè¼ÆµÄ»ù±¾ÒªÇó......................................................................... 10 2.1.2 110KV±äµçÕ¾µçÆøÖ÷½ÓÏß·½°¸Éè¼Æ ............................................................. 12 2.2 110KV±äµçÕ¾Ö÷ÒªµçÆøÉ豸µÄÑ¡Ôñ ........................................................................ 17
2.2.1 Ö÷ÒªµçÆøÉ豸µÄÑ¡ÔñÔÔò............................................................................. 17 2.2.2 110KV±äµçÕ¾Ö÷ÒªµçÆøÉ豸µÄÑ¡Ôñ ............................. ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£ 2.3 110KV±äµçÕ¾¶Ì·µçÁ÷µÄ¼ÆËã ................................................ ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£
2.3.1 ¶Ì·µçÁ÷µÄ»ù±¾ÀàÐÍ..................................................... ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£ 2.3.2 ¶Ì·µçÁ÷¼ÆËãµÄÄ¿µÄ..................................................... ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£ 2.3.3 ¶Ì·µçÁ÷µÄ¼ÆËã............................................................. ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£ 2.4 ±¾ÕÂС½á ................................................................................... ´íÎó£¡Î´¶¨ÒåÊéÇ©¡£