2012.11.06 SD-DOP-DPP-ST-50 Éú»îÂ¥5¡¢6²ãµõ×°·½°¸ 5 rev.0 - ͼÎÄ

COOEC º£Ó͹¤³Ì

±í4.2 µõ³µ×÷Óñí

Table4.1 Crane function table Lifting explanationµõװ˵Ã÷ Crane selectµõ³µÑ¡Óà ProjectÏî Ä¿ Panel¼×°åƬ Lifting yardµõװλÖà Crane modelµõ³µÐͺŠTonnage craneµõ³µ¶Öλ Main boomÖ÷°Ç¸Ë Operational radius »Øת°ë¾¶ Jib¸±±Û ¸±±ÛÇã½Ç(¶È) Jib`s inclination angle Ö÷±ÛÇã½Ç Boom`s inclination angle Crane counterweight ÆðÖØ»úÅäÖØ Carbody counterweight ³µÌåÅäÖØ Superlift counterweight ³¬ÆðÖØÁ¿ Distance between super lifting and rotating center ³¬ÆðÓëÐýתÖØÐľàÀë Crane rated lifting capacity µõ³µ¶î¶¨ÆðÖØÁ¿ Structure weight ½á¹¹ÖØÁ¿(¶Ö) Sling weightµõÉþÖØÁ¿ ж¿ÛÖØÁ¿(¶Ö) Shackles weight(ton) Lifting weight µõ×°ÖØÁ¿ Hook weightµõ¹³ÖØÁ¿ Dynamic amplification coefficient ¶¯Ì¬·Å´óϵÊý Total lifting weight ×ÜÌåµõ×°ÖØÁ¿ Maximum load utilization rate ×î´ó¸ººÉÀûÓÃÂÊ Shackles ж¿Û SD-DOP-DPP-ST- LF7-2 DPP EL.(+)45 250 to EL.(+)47 750 of LQ Assembly yard×Ü×鳡µØ MANITOWOC 18000 MAX-ER 55A 600T NO.1 97.5m 24m 77.6¡ã 223.17T 145.15T MANITOWOC 18000 MAX-ER 55A 600T NO.2 85.3m 28m 72.9¡ã 223.17T 145.15T 350.17T Crane parameter µõ³µ²ÎÊý 144.4T 88.95 1.029 0.150 11.4 1.1 111.68 77.34% S-BX85-3 2 16Ã× 2¸ù 16m 2rope 289.00T 192.23 1.722 0.332 11.4 1.1 226.25 78.29% S-BX150-4 2 12Ã× 2¸ù 12m 2rope Minimum breaking load£º6888.00kn ×îСÆƶÏÁ¦£º6888.00kn Diameter£º120mm Ö±¾¶£º120mm Rigging µõ×°Ë÷¾ß Wire rope ¸ÖË¿Éþ Minimum breaking load£º3048.50kn ×îСÆƶÏÁ¦£º3048.50kn Diameter£º85mm Ö±¾¶£º85mm

LF 7-2 DPP MODULE SHOP DESIGN LIFTTING

PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ

Page 25 of 45

COOEC º£Ó͹¤³Ì

SD-DOP-DPP-ST- 5 CALCULATION REPORT¼ÆË㱨¸æ

Calculation report for EL.(+)45 250 to EL.(+)47 750 of LQ stress check refer to the following. Éú»îÂ¥5,6²ãµÄÇ¿¶È¼ÆË㱨¸æ²Î¼ûÏÂÃæ:

the detail information of the panels for 0o lifting:ˮƽƬ0oµõ×°¼ÆËã½á¹û

Lifting Condition Weight (T) C2 EL.(+)45 250 to EL.(+)47 750 of LQ Horizontal panel¡¯s No. Dimension L¡ÁW (m) Maximum Maximum Member UC JOINT DEFLECTION£¨cm£© 0.58 2.317 2.90 3.19 Cranes 186.87 233.58 256.94 25.5¡Á22.2 Two 600T crawler cranes C3 C4 0.74 0.82 NOTE:C2= 1.05*C1 C3=1.25*C2 C4=1.1*C3

×î´ó½ÚµãλÒÆ ³ß´çL¡ÁW ×î´ó¸Ë¼þUC (Ã×) £¨ÀåÃ×£© 0.58 25.5¡Á22.2 0.74 0.82 2.317 2.90 3.19 2̨600Tµõ»ú ˮƽƬ±àºÅ ¹¤¿ö µõÖØ£¨¶Ö£© µõ»ú C2 EL.(+)45 250 to EL.(+)47 750 of LQ 186.87 233.58 256.94 C3 C4 ˵Ã÷£ºC2=1.05*C1 C3=1.25*C2 C4=1.1*C3

LF 7-2 DPP MODULE SHOP DESIGN LIFTTING

PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ

Page 26 of 45

COOEC º£Ó͹¤³Ì

SD-DOP-DPP-ST- UC and deflection check of EL.(+)45 250 to EL.(+)47 750 of LQ by 0o lifting£¨UC>0.4£©: Éú»îÂ¥5,6²ã0oµõ×°±äÐμ°UCÖµ£¨UC>0.4£©£º

Shape ±äÐÎ

UC (C4) UCÖµ£¨C4¹¤¿öÏ£©

LF 7-2 DPP MODULE SHOP DESIGN LIFTTING

PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ

Page 27 of 45

COOEC º£Ó͹¤³Ì

SD-DOP-DPP-ST- the detail information of the panels for 45o lifting:ˮƽƬ45oµõ×°¼ÆËã½á¹û

Lifting Condition Weight (T) C2 EL.(+)45 250 to EL.(+)47 750 of LQ Horizontal panel¡¯s No. Dimension L¡ÁW (m) Maximum Maximum Member UC JOINT DEFLECTION£¨cm£© 0.45 0.10 0.12 0.14 Cranes 186.87 233.58 256.94 25.5¡Á22.2 Two 600T crawler cranes C3 C4 0.57 0.63 NOTE:C2= 1.05*C1 C3=1.25*C2 C4=1.1*C3

×î´ó½ÚµãλÒÆ ³ß´çL¡ÁW ×î´ó¸Ë¼þUC (Ã×) £¨ÀåÃ×£© 0.45 25.5¡Á22.2 0.57 0.63 0.10 0.12 0.14 2̨600Tµõ»ú ˮƽƬ±àºÅ ¹¤¿ö µõÖØ£¨¶Ö£© µõ»ú C2 EL.(+)45 250 to EL.(+)47 750 of LQ 186.87 233.58 256.94 C3 C4 ˵Ã÷£ºC2=1.05*C1 C3=1.25*C2 C4=1.1*C3

UC and deflection check of EL.(+)45 250 to EL.(+)47 750 of LQ by 45o lifting£¨UC>0.4£©: Éú»îÂ¥5,6²ã45oµõ×°±äÐμ°UCÖµ£¨UC>0.4£©£º

LF 7-2 DPP MODULE SHOP DESIGN LIFTTING

PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ

Page 28 of 45

ÁªÏµ¿Í·þ£º779662525#qq.com(#Ì滻Ϊ@)