COOEC 海油工程
SD-DOP-DPP-ST-
Shape
变形
UC (C3)
UC值(C3工况下)
LF 7-2 DPP MODULE SHOP DESIGN LIFTTING
PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ
Page 37 of 45
COOEC 海油工程 Padeye Check吊点强度校核
Padye check: padeye check is calculated for PCE. 吊点强度校核:吊点校核采用PCE软件进行计算。
SD-DOP-DPP-ST-
LF 7-2 DPP MODULE SHOP DESIGN LIFTTING
PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ
Page 38 of 45
COOEC 海油工程
SD-DOP-DPP-ST-
根据SACS计算结果,最大吊绳力为1377.6KN、609.7KN(包含1.05不确定系数,1.25索具系数,静力工况):
According to the result of SACS, the maximum sling load is 1377.6KN、609.7KN(including weight uncertainty factor 1.05 and skew load factor 1.25,static condition) 吊点计算结果见下图
The result of padeye is shown as follow.
LF 7-2 DPP MODULE SHOP DESIGN LIFTTING
PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ
Page 39 of 45
COOEC 海油工程
SD-DOP-DPP-ST-
LF 7-2 DPP MODULE SHOP DESIGN LIFTTING
PLAN FOR EL.(+)45 250 TO EL.(+)47 750 OF LQ
Page 40 of 45