? Waste type and characteristics;

·ÏÁÏÀàÐͺÍÌØÐÔ£»

? Waste source and Waste quantities (volume/mass)

À¬»øÔ´ºÍÀ¬»øÊýÁ¿£¨ÈÝ»ý¼°ÖØÁ¿£©£»

? Those reports are prepared and submitted to Local Authority by the 5th of each month;

see attached Monthly Waste Transfer Report. ×¼±¸ºÃÕâЩ±¨¸æ²¢ÓÚÿÔÂ5ÈÕǰÉϱ¨µ±µØÖ÷¹Ü²¿ÃÅ£»

? Waste is safely and correctly transferred to the place approved by Local Authority ;and

À¬»øÒª°²È«ºÍ׼ȷµØÔËÊäµ½µ±µØÕþ¸®Ö÷¹Ü²¿ÃÅÖ¸¶¨µÄµØµã£»

? Prior to demobilization, all waste is transferred to the place approved by Local Authority.

Í˳¡Ç°£¬ËùÓеÄÀ¬»øÒªÔËË͵½µ±µØÕþ¸®Ö÷¹Ü²¿ÃÅÖ¸¶¨µÄµØµã£»

25.3.3 Libeiya has already talked with CPL responsible person and agreed to the following: Libeiya

is responsible to collect and maintain its construction waste in the dustbins in the onsite temporary facilities zone in good order, and coordinate with CPL HSE representative for removal of the construction waste to be done by the Construction Waste Management Contractor.

Àö±´ÑÇÒѺÍCPLÓйØÈËÔ±É̶¨£¬Àö±´Ñǽ«×Ô¼ºµÄÊ©¹¤À¬»øÊÕ¼¯²¢´æ·ÅÔÚËüÓÐÏÖ³¡ÁÙ½¨ÇøÓòÄÚµÄÀ¬»øÏäÄÚ£¬Í×ÉÆ±£¹Ü¡£²¢ÓëCPLÓйØÈËÔ±¼°Ê±Ð­µ÷£¬ÓÉCPLµÄÊ©¹¤À¬»ø¹ÜÀíÉ̸ºÔðÇå³ýÕâЩÀ¬»ø¡£

25.3.4 Libeiya will be responsible for its own waste generated from day to day construction activities.

Àö±´Ñǽ«Ó¦¸ºÔð×Ô¼ºÃ¿ÈÕ²úÉúµÄÊ©¹¤·ÏÁÏ£»

25.3.5 Waste Storage areas near the main construction areas and Libeiya office area will be set to

collect and store construction waste and garbage generated office area. À¬»ø¶Ñ·Å³¡½«½¨ÔÚÖ÷Ê©¹¤ÇøºÍÀö±´ÑÇ°ì¹«ÇøÓò¸½½ü£»

25.3.6 The above mentioned waste shall be classified as non-hazardous and hazardous and

identified clearly.

ÉÏÊöÀ¬»øÓ¦°´Óк¦¡¢ÎÞº¦·ÖÀàºÍ±êʶ£»

25.3.7 Waste inventory shall be maintained in good condition, A monthly waste transfer report shall be

submitted CPL by the 5th of each month..

Ó¦½«À¬»ø¿â´æ±£³ÖÍêºÃµÄ״̬£¬²¢ÔÚÿÔµÄ5ÈÕǰÏòCPLÌá½»·ÏÁÏÔËÊ䱨¸æ£»

25.3.8 Libeiya shall ensure that wastes are stored in suitable containers and the containers are

clearly marked with

Àö±´Ñǽ«È·±£·ÏÁÏÖü´æÔÚÊʺϵÄÈÝÆ÷ÖУ¬ÈÝÆ÷ÒªÓÐÇå³þµÄ±êÖ¾, ±êÖ¾°üÀ¨£º ? Name of material / waste

²ÄÁÏ/·ÏÁϵÄÃû³Æ

? Name of waste producer (e.g. Libeiya)

·ÏÁϲúÉúÕßµÄÃû×Ö£¨È磺Àö±´ÑÇ£© ? Storage date

´æ·ÅÈÕÆÚ¡£

? Mass / volume of waste

47

·ÏÁϵÄÊýÁ¿/ÈÝ»ý¡£

25.4

Prevent Air Pollution ±ÜÃâ¿ÕÆøÎÛȾ

25.4.1 The waste produced in construction must be timely cleaned and delivered. Moderately

watering may reduce dust while cleaning and delivering.

Ê©¹¤·ÏÁϱØÐ뼰ʱÇåÀí²¢Ô˳öÏÖ³¡¡£ÔÚÇåÀíºÍÔËÊä¹ý³ÌÖÐÅçÁÜË®»á¼õÉÙ»Ò³¾·ÉÑï¡£

25.4.2 It is necessary to spring water while removing the building so as to reduce dust.

ÔÚ²ð³ý½¨ÖþÎïʱÓбØÒªÈöË®ÒÔ½µµÍ»Ò³¾Á¿¡£

25.4.3 Well spraying water to the temporary construction roads on site at any moment in order to

reduce dust.

ΪÏÖ³¡ÁÙʱʩ¹¤µÀ·ÈöË®ÒÔ½µµÍ»Ò³¾Á¿¡£

25.4.4 The bulk cement and other granule bulk material that easy to fly must be stored in warehouse.

If exposed, it must be strictly covered. Prevent from mud and sand flying while loading or unloading materials.

É¢×°Ë®Ä༰ÆäËüÒ×ÓÚ·ÉÑïµÄÁ£ÁϱØÐë´æ·ÅÔÚ²Ö¿âÄÚ¡£Èç¹û±©Â¶ÔÚÍâʱ£¬±ØÐë·â¸ÇÑÏÃÜ¡£×°»õж»õʱҪ±ÜÃâÄàɳµÄ·ÉÑï¡£

25.4.5 It is necessary to watering in cement or soil construction to reduce the dust.

ÔÚË®Äà»òÍÁÁÏÊ©¹¤ÖпÉÒÔÈöË®À´½µµÍ»Ò³¾¡£

25.4.6 It must take measures, e.g. watering, to reduce dust in the season when dust easily engenders.

ÔÚÈÝÒ׳öÏַɳ¾µÄ¼¾½Ú²ÉÈ¡±ØÒªµÄ´ëÊ©£¬ÈçÅçË®À´½µµÍ·É³¾¡£

25.4.7 The ground must be hardened in the construction location to prevent the strong wind from

flying dust.

Ê©¹¤Î»ÖõĵØÃæ±ØÐëÊʵ±º»ÊµÒÔ±ÜÃâ·ç´µ³¾Ñï¡£

25.4.8 The sprayer will be used on site for cement mixer to prevent any material flying.

ÔÚÏÖ³¡½Á°èɳ½¬Ê±¿ÉÒÔÓÃÅçÁÜÍ·ÒÔ±ÜÃâ²ÄÁÏ·ÉÑï¡£

25.5

Prevention of noisy pollution ·ÀÖ¹ÔëÉùÎÛȾ

25.5.1 Prevent the noisy pollution resulted from the construction.

Òª±ÜÃâÊ©¹¤²úÉúµÄÔëÉù¡£

25.5.2 Materials are prohibited throwing from truck and never make loud while removing the materials

from any structures.

²»µÃ´Ó¿¨³µÉÏÏòÏÂÈÓ¶«Î÷¶øÇÒ¾ø²»ÔÊÐí´Ó½á¹¹Éϲð³ý²ÄÁÏÊ±ÖÆÔì´óµÄÔëÉù¡£

25.5.3 Under the normal condition, it is not allowed mixing mortar during the night.

ÔÚÕý³£Çé¿öÏ£¬²»µÃÔÚÒ¹¼ä½øÐÐɰ½¬½Á°è¹¤×÷¡£

25.5.4 Persons in high noisy area must use ear-plugs in their work. And during the work, the working

staffs must be trying best to eliminate any high level noise and also known hearing protection knowledge.

ÔÚÔëÉù¸ßµÄÇøÓòÄÚ¹¤×÷µÄÈËÔ±±ØÐëÅä´÷¶úÈû¡£ÔÚÊ©¹¤¹ý³ÌÖУ¬Ê©¹¤Ô±±ØÐ뾡Á¦¼õÉÙ²úÉúÔëÉùµÄ³Ì