Ê©¹¤×éÖ¯Éè¼Æ(ÖÐÓ¢ÎĶÔÕÕ) ÏÂÔر¾ÎÄ

order to ensure the correct dimensions of the steel work, special tools like clamps can be made to control the same.

5.2.3.4Ê©¹¤ÖиֽîµÄ°óÔú½ÓͷλÖÃÓ¦Ï໥´í¿ª.´ÓÈÎÒ»°óÔú½ÓÍ·ÖÐÐÄÖÁ´î½Ó³¤¶ÈL1µÄ1.3±¶Çø¶Î·¶Î§ÄÚ,ÓаóÔú½ÓÍ·µÄÊÜÁ¦¸Ö½î½ØÃæÃæ»ýÕ¼ÊÜÁ¦¸Ö½î×ܽØÃæÃæ»ýµÄ°Ù·ÖÂÊ,Ó¦·ûºÏÒÔϹ涨:ÊÜÀ­Çø²»µÃ³¬¹ý50%¡£°óÔú½ÓÍ·ÖиֽîµÄºáÏò¾»¾àS²»Ó¦Ð¡ÓÚÖ±¾¶DÇÒ²»Ó¦Ð¡ÓÚ25mm¡£During execution, the binding joints shall be not in one line. The center of the joint to the overlap length (L1)shall be less than 1.3 L1. The percentage (the cross section of the steel bars under stress with binding joints be divided by the total cross section of the bars under stress) shall comply with the stipulation: the length under stress shall be less than 50%. S(net space) shall no be smaller than D (diameter) but not small than 25 mm.

5.2.3.5¶ÔµçÔüѹÁ¦º¸,Æøѹº¸Òª¼ì²é½ÓÍ·Íâ¹ÛÖÊÁ¿,°üÀ¨º¸¿ÚÍ»³ö±íÃæ¸ß¶È,ÍäÕ۽ǶÈ(²»´óÓÚ4»ò70/1000)ºÍÖáÏßÆ«ÒƵÈÏîÄÚÈÝ,¸Ö½î½ÓÍ·Ò»¶¨ÒªÀ뿪¹Õµã¡Ý10D,²»×¼Î»ÓÚ¹¹¼þµÄ×î´óÍä¾à´¦¡£Ê©¹¤ÖÐÓÃÎ޳ݾ⽫¸Ö½î¶Ë¿ÚÇÐƽ,ÏȺ¸¸ßλ½î,ºóº¸µÍλ½î¡£For welding, it is imperative to check the joint¡¯s outlook, the joint itself, the bent angle(no greater than 4 or 70/1000) and the axis deviation. The joint shall be away from the inflexion (greater or equal to 10D). During execution, cut the bar end even, first weld the high level bars and then the lower ones.

5.2.3.6¸Ö½î±£»¤²ãºñ¶ÈThe Concrete Cover£º¸Ö½î±£»¤²ã³ß´ç¿ØÖÆÊÇ·ñ׼ȷ¼°¸Ö½îλÖÃÊÇ·ñÂú×ãÉè¼ÆÒªÇóÊÇ´´Óżì²éµÄÒ»ÏîÖصãÄÚÈÝ,Ò²ÊÇ´æÔÚÎÊÌâ½Ï¶àºÍ²»Ò׿ØÖƵÄÎÊÌâ,Ê©¹¤ÖÐÓ¦²ÉÓÃÉ°½¬µæ¿é»òËÜÁϵæ¿é¿ØÖƱ£»¤²ãºñ¶È£¬¶ÔÓÚÖù×Ó¸Ö½îµÄ¶¨Î»Ò»°ã²ÉÓö¨Î»¿¨ÔÚ½½ÖþíÅÇ°½«¶¨Î»¿¨Ì×ÔÚÖù½î¶¥¶Ë,Óðó¿Û½«Öù½î½ô¿¿ÔÚ¶¨Î»¿¨ÉÏ,¿ØÖƸֽî¼ä¾àλÖÃ,ϲ¿ÓÃËÜÁϵæ¿é¿ØÖƱ£»¤²ãºñ¶È¡£The proper concrete cover and the location of the reinforcement steel shall be checked. It is the main checking for creating the first class quality work for many problems happened in this regard. Cement mortar and plastic spacers made of are used to

control the concrete cover. The spacers are usually fixed on the top of the column reinforcement steel and at bottom, plastic ones, to control the concrete coverage.

5.2.3.7¸Ö½îÔÚ°óÔúʱעÒâ¼ä¾à¼°¸Ö½îµÄ¹æ¸ñ£¬¸Ö½î¼ä¾à£¬Ãª¹Ì³¤¶ÈÓ¦·ûºÏͼֽ¼°¹æ·¶ÒªÇó,¶ÔÓÚÐüÌô½á¹¹£¬¸Ö½îµÄ°Ú·ÅÓ¦ÕýÈ·¡£¸Ö½î±£»¤²ãºñ¶ÈÒª±£Ö¤£¬»¹Òª×¢Òâ²»µÃ©¿ÛÒÔ¼°°ó¿ÛË¿Ïòʱ£¬·ÀÖ¹ÆäÐâÊ´ÎÛȾíÅÍâ±íÃæ¡£When fabricating, attention shall be paid to the space between bars and their diameters. The anchor length shall comply with the requirements of drawings and the specifications. For those cantilever structures, the reinforcement steel hall be positioned properly and the concrete cover shall be ensured. No stirrups are missing and the end of the binding seams shall be bent inward to avoid the concrete surface from being stained and rusted.

5.2.4폤³ÌThe Concrete Work

5.2.4.1Ê©¹¤Ç°Ó¦½øÐÐíÅÅäºÏ±ÈÉè¼Æ,Ê×Ïȸù¾ÝÏÖ³¡Êµ¼ÊËùÓÃÔ­²ÄÁϵÄÐÔÄܼ°¶Ôíŵļ¼ÊõÒªÇó½øÐмÆËã,ÔÙ¾­ÊÔÑéÊÒÊÔÅä¼°µ÷Õû,¶¨³ö¼ÈÂú×ãÉè¼ÆºÍÊ©¹¤ÒªÇó,ÓÖ¾­½Ï¾­¼ÃºÏÀíµÄíÅÅäºÏ±È¡£µ±Ô­²ÄÁÏ·¢ÉúÏÔÖø±ä»¯Ê±,Ó¦ÖØнøÐÐÅäºÏ±ÈÉè¼Æ¡£Ê©¹¤¹ý³ÌÖÐÑϽûËæÒâ¸Ä±äÅäºÏ±È¡£Before execution, the concrete mix ratio shall be designed. Based on the features of the materials at site and the technical requirements of the concrete, calculations shall be worked out and adjustments shall be made in the lab so as to obtain the proper concrete mix ratio which complies with the design and technical requirements for the execution and is also reasonably economic. When there are changes in the materials to be used, then new and proper mix ration shall be worked out. However this ratio is strictly forbidden to be changed at will.

5.2.4.2Ê©¹¤Ç°±ØÐë¶ÔÄ£°å¡¢¸Ö½î¹¤³Ì½øÐÐÒþ±Î¹¤³ÌÑéÊÕ£º¼ì²éÄ£°å±ê¸ß¡¢Î»Öᢹ¹¼þµÄ½ØÃæ³ß´çÊÇ·ñÂú×ãÉè¼ÆÒªÇ󣬹¹¼þÔ¤Áô¹°¶ÈÊÇ·ñÕýÈ·¡£¼ì²éÄ£°å½Ó·ì¡¢ÒõÑô½ÇƽÕû¶ÈºÍÖ§³ÅÇé¿ö£¬¼ì²é¸Ö½î¡¢Ô¤Âñ¼þµÄ¹æ¸ñ¡¢ÊýÁ¿¡¢°²×°Î»Öü°¹¹¼þ½ÓµãÁ¬½Óº¸·ì϶ÊÇ·ñÓëÉè¼ÆºÍÊ©

¹¤¹æ·¶µÄÒªÇóÏà·ûºÏ¡£¼ì²éË®¡¢µç¡¢Å¯µÈÉ豸¹ÜµÀµÄλÖá¢ÊýÁ¿ÊÇ·ñ׼ȷÎÞÎó¡£¾­°à×é¡¢¹¤ÖÖ¼ä×Լ졢»¥¼ì¡¢Ê©¹¤µ¥Î»ÖʼìԱרְ¼ìÑéºó±¨¼àÀí»ò½¨É赥λפ¹¤µØ´ú±í¼ì²éÑéÊÕ¡£¾­ÒÔÉϸ÷Ïî¼ì²éÎÞÎó²¢°ìºÃÒþ±Î¹¤³ÌÑéÊÕÊÖÐøºó·½¿É½½ÖþíÅ¡£íŽ½ÖþʱӦÓÐľ¹¤¡¢¸Ö½î¹¤ÅäºÏ¿´Ä£°åºÍ¿´¸Ö½î£¬ÒÔ±£Ö¤Ä£°å¡¢¸Ö½î²»±äÐΡ£Before concrete casting, form work, reinforcement steel work and those hidden items shall be checked. For formwork, check its level, position, parts and elements to see if they all comply with the designing requirements. Check the arch if it is correct. Check the joints, corners supports, reinforcement steel, embedded elements and their numbers, locations, welding points, water and electrical pipes, ventilation ducts and shafts, their numbers and locations, and etc, till all these comply with the designing requirements and specifications. Checks are carried out within the work groups, among the work groups of different trades, and by the professional quality inspectors and then submit to the Supervisor and the representatives of the Client for approval. Only when the above- mentioned checks including on hidden items are completed without finding any mistakes, can concrete casting be carried out. During casting, carpenters and rebar men shall be at the spot to ensure that no deform of either form work or reinforcement steel happens.

5.2.4.3±¾¹¤³ÌµÄÖ÷Òª½á¹¹¾ù²ÉÓñÃËÍÉÌÆ·íŵķ½·¨£¬ËùÒÔíÅ°èºÍÎï³ýÂú×ãÉè¼Æ¹æ·¶¹æ¶¨µÄÇ¿¶È¡¢Ä;ÃÐÔÒªÇóÍ⣬»¹ÐèÂú×ã¹ÜµÀÊäË͵ÄÒªÇ󣬼´íÅ°èºÍÎïÐëÓÐÁ¼ºÃµÄ¿É±ÃÐÔ¡£Îª±£Ö¤Ê©¹¤ÖÊÁ¿¡¢½ø¶ÈÄ¿±ê£¬ÐëÈÏÕæÑ¡Ôñ·ûºÏ¹ú¼ÒÓйع涨±ê×¼¡¢¾ßÓнÏǿʵÁ¦¼°Éú²úÄÜÁ¦¡¢ÓÐÁ¼ºÃÐÅÓþµÄרҵÉÌÆ·íÅÉú²ú³§¼Ò£¬Ñϸñ¿ØÖÆÔ­²ÄÁÏÖÊÁ¿¡£Casting for the main project structure twill be dong by the concrete pump. So the concrete shall comply with the intensity and endurance by the design requirements and specifications, and also conveyable through the pipes by the pump. In order to guarantee the execution quality and progress target, it is imperative to choose the ready made concrete supplier with good

credit and rather powerful, who supply the concrete up to the state standards. Besides the quality of the materials shall be strictly controlled.

5.2.4.4íűÃËÍʱµÄÊ©¹¤·½·¨The execution method£º£¨1£©íŽÁ°èÔËÊä³µ³öÁÏÇ°£¬Ó¦¸ßËÙת¶¯30sºó·´×ª³öÁÏ£»Before discharge, the trans-mixer shall properly mix 30 seconds;£¨2£©±ÃËÍíÅÇ°£¬ÏÈ°Ñ´¢Á϶·ÄÚÇåË®´Ó¹ÜµÀ±Ã³å³öÀ´£¬´ïµ½ÊªÈóºÍÇå½à¹ÜµÀµÄÄ¿µÄ£¬È»ºóÏòÁ϶·ÄÚ¼ÓÈëÓëíÅÅä±ÈÏàͬµÄË®ÄàÉ°½¬£¨»ò1£º2Ë®ÄàÉ°½¬£©£¬È󻬹ܵÀºó¼´¿É¿ªÊ¼±ÃËÍíÅ£»Before pumping the concrete, all the water in the storage drum and pipes shall be cleared away, then add the same mix ratio mortar (1:2 cement mortar) to lubricate the pipes. After that discharge the concrete;£¨3£©¿ªÊ¼±ÃËÍʱ£¬íűòÙ×÷ÈËԱӦʹíŵÍËÙÔËת£¬´ý˳Àû±ÃËͺóÔÙÌá¸ßÔËתËٶȣ¬¼Ó´óÐг̣¬×ªÈëÕý³£µÄ±ÃËÍ£¬Èô폩Ӧ²»¼°Ê±£¬Äþ¿ÉÂýËÙ¼äЪ±ÃËÍ£¬Ò²Òª±£³ÖÁ¬Ðø±ÃËÍ£»when starting, the operator shall pump the concrete at rather low speed, and then speed up until normal operation. If the concrete supply is not in time, keep the slow and continuous pumping. £¨4£©íűÃËͼ´½«½áÊøÇ°£¬Ó¦ÕýÈ·¼ÆËãÉÐÐèÓõÄíÅÊýÁ¿£¬²¢¼°Ê±¸æÖªíŽÁ°è´¦£»Before pumping coming to an end, work out the volume of th concrete needed and inform the batching plant of the same;£¨5£©íűûò±Ã³µÊ¹ÓÃÍê±ÏÓ¦¼°Ê±ÇåÏ´¡£Trans-mixer should be timely cleaned after casting.

5.2.4.5±ÃËÍíŵĽ½Öþ˳ÐòCasting procedures by the pump£º£¨1£©²ÉÓÃíÅÊäË͹ÜÊäËÍíÅʱ£¬Ó¦ÓÉÔ¶¶ø½ü½½Öþ£»From far away to closer places;£¨2£©ÔÚͬһÇøÓòµÄíÅ£¬°´ÏÈÊúÏò½á¹¹ºóˮƽ½á¹¹µÄ˳Ðò£¬·Ö²ãÁ¬Ðø½½Öþ£»For the same area, first the vertical structures, then the horizontal ones, layer by layer;£¨3£©µ±²»ÔÊÐíÁôÊ©¹¤·ìʱ£¬ÇøÓòÖ®¼ä¡¢ÉÏϲãÖ®¼äµÄ펽Öþ¼ä϶ʱ¼ä£¬²»µÃ³¬¹ýíųõÄýʱ¼ä£»If no joints are permitted, the time difference between two areas or two layers shall not longer than the time concrete sts.£¨4£©µ±Ï²ãíųõÄýºó£¬½½ÖþÉϲãíÅʱ£¬Ó¦°´Ê©¹¤·ìµÄ¹æ¶¨´¦Àí¡£When casting, if the lower layer of concrete has set, then joint has to be made between the upper layer and the lower one.