第一章

- 1 -

- -

II

摘要

摘 要

本毕业设计论文是2×600MW发电厂电气部分初步设计。全论文除了摘要、毕业设计书之外,还详细的说明了各种设备选择的最基本的要求和原则依据。 变压器的选择包括:发电厂主变压器、高压备用变压器及高压厂用变压器的台数、容量、型号等主要技术数据的确定;电气主接线主要介绍了电气主接线的重要性、设计依据、基本要求、各种接线形式的优缺点以及主接线的比较选择,并制定了适合本厂要求的主接线; 厂用电接线包括:厂用电接线的总要求以及厂用母线接线设计。短路电流计算是最重要的环节,本论文详细的介绍了短路电流计算的目的、假定条件、一般规定、元件参数的计算、网络变换、以及各短路点的计算等知识; 高压电气设备的选择包括母线、高压断路器、隔离开关、电流互感器、电压互感器、高压开关柜的选择原则和要求,并对这些设备进行校验和产品相关介绍 。而根据本论文所介绍的高压配电装置的设计原则、要求和500KV的配电装置,决定此次设计对本厂采用分相中型布置。继电保护和自动装置的规划,包括总则、自动装置、一般规定和发电机、变压器、母线等设备的保护,而发电厂和变电所的防雷保护则主要针对避雷针和避雷器的设计。此外,在论文适当的位置还附加了图纸(主接线、平面图、防雷保护等)及表格以方便阅读、理解和应用。

关键词 电力系统,短路计算,设备选择,母线,高压断路器

- I -

Abstract

Abstract

This paper is the designation to 2×600MW thermal power plant electricity part. Whole thesis besides summary graduate to design the book outside, returned the expatiation every kind of most basic request that equipments choose with principle according to. The choice of the transformer includes:Main transformer, high pressure in power plant back transformer and high pressure factories use the main technique in number, capacity, model number...etc. in set data of the transformer to really settle;The electricity lord connected the line to introduce primarily the electricity lord connects the linear importance, design according to, the basic request, every kind of merit and shortcoming and lords that connect the line form connects the linear choosing more, the lord that combine to establish the in keeping with my plant the request connects the line; The factory connects with the electricity the line includes:The factory connect the linear total request and factory to connect the line design with the mother line with the electricity.The short-circuit galvanometer is regarded as the most important link, this thesis introduced the calculating purpose in short-circuit electric current, assumption term, general provision, the calculation, network transformation of a parameter detailedly, and each calculation etc. knowledge that short circuit order; The choice of the high pressure electricity equipments includes the mother line, high pressure breaks the road machine and insulate the switch, electric current to feels with each other the machine, electric voltage feels with each other the choice principle of the machine, high pressure switch cabinet with request, and proceed to these equipmentseses the school check with the related introduction in product.But go together with the design principle of the electricity device, request to go together with the electricity device with 500 KVs according to this thesis a high pressure for introducing, decide this time design to adopt the cent the mutually medium-sized arranging to the my plant.After electricity protection with the programming of the automatic device, include total, automatic device, general provision with the protection of generator, transformer, mother line etc. equipments, but power plant with change to give or get an electric shock a design for defending thunder protecting then primarily aiming at lightning rod with lightning arrester.In addition, return in the appropriate position in thesis additional diagram paper( the lord connects the line, plane chart and defend thunder protection etc.) and forms read, comprehend with the convenience with applied.

Key Words Power system,short circuit calculation,The equipments choice,Bus,

High voltage circuit breaker

- II -