摘 要

安全生产保证措施,应急预案等。并结和资料图纸和预算定额等估算出整个工程量努力提高劳动效率,现场安全措施,文明工,环境保护等,保证工程的安全与质量。

Abstract

The project is located in Harbin, according to the requirements of the graduation design, and combined with the project of the existing norms, procedures, specific circumstances and other relevant information, the preparation of the construction organization design documents. A construction organization design plays a decisive role in the engineering project, the construction activities in order to reach, improve work efficiency, to shorten the construction period, reduce the cost, the correct qualitative effect.

The construction organization design includes: project preparation and basis, engineering situation and characteristics of the project implementation, construction organization and deployment plan, the amount of equipment, construction schedule and schedule guarantee measures, total construction contract information management, construction layout and management, the main sub segment of the construction scheme and measures to ensure quality, safety assurance measures, emergency plan. Together with the data and drawings and budget estimates to estimate the overall amount of work to improve labor efficiency, on-site safety measures, civilized construction, environmental protection, etc., to ensure the safety and quality of the project.

Key words: construction organization design, schedule, construction plan, construction drawings

I

目录

1 编制说明和依据 ....................................................................................................................... 1 1.1 编制说明 ............................................................................................................................. 1 1.2 编制依据 ............................................................................................................................. 1 2 工程概况与特点 ....................................................................................................................... 3

2.1 工程概况 3

2.2 现场及周边环境 ................................................................................................................. 3 2.3 气候及水文地质情况 ........................................................................................................ 3 2.4 工程特点及施工对策 ........................................................................................................ 3 3 工程实施目标 ....................................................................................... 错误!未定义书签。 3.1 工程质量目标 ................................................................................. 错误!未定义书签。 3.2 工期目标 ......................................................................................... 错误!未定义书签。 3.3 施工环境目标 ..................................................................................................................... 3 3.4 安全及文明施工目标 ........................................................................................................ 3 3.5 团结协作目标 ..................................................................................................................... 3 3.6 科技进步目标 ..................................................................................................................... 3 3.7 工程回访及服务目标 .................................................................... 错误!未定义书签。 4 施工组织和施工部署 ........................................................................... 错误!未定义书签。 4.1 项目组织机构 ................................................................................. 错误!未定义书签。 4.2 施工部署 ............................................................................................................................. 5 4.3 施工准备 ............................................................................................................................. 6 5 劳动力及主要材料、设备用量计划 ..................................................................................... 8 5.1劳动力计划 .......................................................................................................................... 8 5.3机械设备计划 ..................................................................................................................... 9 5.4周转材料计划 ................................................................................................................... 14 6 施工进度计划与工期保证措施 ............................................................................................ 16

II

6.1 施工进度计划 ................................................................................................................... 16 6.2 工期保证措施 ................................................................................................................... 18 6.2.1、建立动态计划模式 ..................................................................................................... 18 6.2.1.1、四级计划的主要内容 ............................................................................................. 18 6.2.1.2、四级计划的执行与控制 ......................................................................................... 18 6.2.1.3、四级计划管理的基本特点 ..................................................................................... 18 6.2.2、工期保证总体措施 ..................................................................................................... 19 6.2.2.1、从组织措施上保证 .................................................................................................. 19 6.2.2.2、从物质措施上保证 .................................................................................................. 19 6.2.2.3、从技术措施上保证 .................................................................................................. 19 6.2.2.4、从配合措施上保证 .................................................................................................. 19 6.2.2.5、从经济措施上保证 .................................................................................................. 19 6.2.2.6、从信息管理措施上保证 ......................................................................................... 19 6.2.3、施工过程工期控制措施 ............................................................................................ 19 7 施工总承包与信息化管理 .................................................................................................... 20 7.1 项目管理及总包管理的原则、模式 ............................................................................. 20 7.2 分包计划和对分包队伍的管理措施 ............................................................................. 20 7.3 总包与业主、监理、设计及供货商配合 .................................. 错误!未定义书签。 7.4 信息化管理 ....................................................................................................................... 22 8 施工现场总平面布置与管理 ................................................................................................ 24 8.1 场地特征 ........................................................................................................................... 24 8.2 施工平面布置 ................................................................................................................... 24 8.3 现场临电、临水计算 ...................................................................................................... 24 8.4 总平面管理 ....................................................................................................................... 25 9 主要分部分项施工方案 ........................................................................................................ 26 9.1 降水、护坡 .......................................................................................................................... 26 9.1.1降水方案 ......................................................................................................................... 26 9.1.2.护坡方案 ....................................................................................... 错误!未定义书签。

III

9.2 土方工程 ........................................................................................................................... 31 9.3 施工测量及变形观测 .................................................................... 错误!未定义书签。 9.4 模板工程 ........................................................................................................................... 34 9.5 钢筋工程 ......................................................................................... 错误!未定义书签。 9.6 混凝土工程 ....................................................................................................................... 44 9.7 底板混凝土施工 ............................................................................. 错误!未定义书签。 9.8 高性能混凝土施工 .......................................................................................................... 47 9.9 预防混凝土碱集料反应措施 .......................................................................................... 47 9.10 脚手架工程 ..................................................................................................................... 48 9.11 砌体工程 ......................................................................................................................... 60 9.12 门窗工程 ......................................................................................................................... 60 9.14 楼、地面工程 ................................................................................................................. 61 9.15 屋面工程 ......................................................................................................................... 61 9.16 防水工程 ......................................................................................................................... 61 9.17 装饰工程 ......................................................................................................................... 63 9.18给排水工程 ...................................................................................................................... 65 9.19电气工程 ........................................................................................ 错误!未定义书签。 10 季节性施工措施 ................................................................................. 错误!未定义书签。 10.1 雨季施工措施 ............................................................................... 错误!未定义书签。 10.2 冬季施工措施 ................................................................................................................. 67 10.3沙尘暴、大风等恶劣气候措施 .................................................................................... 67 11.质量保证措施 ......................................................................................................................... 68 11.1、质量管理组织体系 ...................................................................................................... 68 11.2、质量保证总体措施 ...................................................................................................... 68 11.3、质量保证组织措施 ...................................................................................................... 69 11.4、质量保证管理措施 ...................................................................................................... 70 11.5、质量保证技术措施 ...................................................................................................... 72 11.6、质量保证经济措施 ...................................................................................................... 72

IV